Precision Metal/Die Casting Automobile Fittings and Machine Parts

Basic Info

Model NO.
parts11
Surface Roughness
Ra6.3
Machining Tolerance
+/-0.10mm
Standard
AISI
Certification
CE, RoHS, ISO 9001:2000, ISO 9001:2008, Gt/T19001-2016 Idt ISO9001:2015
Application Area
Machine Parts
Trademark
Inch 3.425*3.425*1.36
Transport Package
Wooden Case
Origin
Ningbo

Product Description

Product Description:

1)  Our factory locates in Zhejiang province, we have ISO 9001:2016 certificate.
2)  We has 26 years' production experience  could help customer design the mold and offer valued suggestions to reduce costs for customer
3)  OEM/ODM is our strength

Casting Information:
 
Materialstainless steel, carbon steel ,alloy steel,,ductile Iron,grey iron, etc,according to customer drawings and specifications.
Casting Silica Sol casting ,composite casting, soluble glass casting, sand casting, gravity casting, permanent mold casting, high pressure die casting, low pressure die casting, ect.
Machiningturning , milling, drilling, grinding, threading, CNC machining, etc.
Surface  sand blasting, shot/ bead blasting, polishing, plating, acid treatment, anodizing, painting, powder coating,passivating,electropolishing ect.
Process
Drawing & Samples→Mould making→ Die casting  →  Deburring  →  Drilling and threading →  CNC Machining  → Polishing  →  Surface treatment →  Assembly  →  Quality inspection  →  Packing →Shipping
ApplicationAuto & motocyle & bicycle  parts, Furniture accessories, Power tool housing, Pump housing,
Mechanical parts, 
MachineDie casting machine 120 ton/280 ton/400 ton/500 ton/800 ton/1250 ton 

Material Available:
 
Stainless SteelSS201,SS301, SS303, SS304, SS316, SS416 etc.
 SteelMild steel, Carbon steel4140, 4340, Q235, Q345B, 20#, 45# etc.
CopperC11000,C12000,C12000 C36000 etc.
IronA36, 45#, 1213, 12L14, 1215 etc.



FAQ:
1. How many days it will take to develop one new item?
It will take about 20days to make molds and make samples for your checking.

2. What is your common delivery time for a bulk production?
Commonly 30days after prepayment paid

3. What is common payment terms?
T/T full payment for molud, then samples confirmed. 30% T/T prepayment should be arranged, then balance against BL copy.